This building utilized a pre-engineered Steelway building joining with a 2-storey conventionally framed steel office building.
A great location and design that suits the site perfectly made this a prestige office/shop building for many kinds of buisness.
Vicano Construction Limited was hired on as the Construction Manager for the addition to "Deb Worldwide Healthcare Inc." formally known as "Ethena".
The 14,356 sq.ft.
Vicano Construction Limited is proud to announce the completion of the new Wal-Mart store in Simcoe, ON. The project was constructed in 4 months from start to “turn-over” to the complete satisfaction of Wal-Mart Canada.
Archmill House Inc. was in need of an expansion to their existing millwork manufacturing facility and hired Vicano Construction Limited to expand the facility with a 14,000 sq.